Cleaning of Matrix injectors
Disassembly:
Screw out 4 pcs of imbus 2.5 mm. Take down part of body with nozzles.
Screw out 2 pcs of imbus 2.5 mm. Attention, everythinfg can go to pieces ! Avoid loss of them.
Assembly:
At the first, put rubber reversible pad to the plastic part of body. Up to plastic pad put down brass pad. See pic. 1, 2.
http://lpg-forum.pl/files/1_2_201.jpg
Up to these revesible pads put down metal lame with rubber sit [8x]. Attention, chamfer face up. See pic.3 [wrong is signed].
http://lpg-forum.pl/files/3_707.jpg
Up to metal lames, put distance pad. See pic. 4
http://lpg-forum.pl/files/4_139.jpg
Put in peripheral seal and put together with part of body with coils. Screw by 2 pcs of imbus 2.5mm. See pic. 5,6.
http://lpg-forum.pl/files/5_6_150.jpg
Check all O-ring seals and put together with cover of Matrix. Screw by 4 pcs of imbus 2.5 mm. See pic.
http://lpg-forum.pl/files/7_8_155.jpg
Matrix heating up:
For better working Matrix injector in winter it ir recommended to warm it up by hot water cooling car system. See pic.
http://lpg-forum.pl/files/hot_178.jpg
Intervals for servis:
Every 20 000 km – change gas filter [gaseous state] and part of hose behind the filter
Every 20 000 km – cleaning Matrix injectors
Every 20 000 km – change LPG filter in LPG valve
Every 100 000 km – change memranes in reducer |